IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0014 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,970 $1,000 Implemented
MA0010 # 07 Y:1984 07 1984 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,680 $8,130 Implemented
MA0010 # 06 Y:1984 06 1984 HEAT WATER WITH EXHAUST HEAT $16,603 $22,000 Not Implemented
MA0010 # 05 Y:1984 05 1984 OPERATE BOILERS ON HIGH FIRE SETTING $3,110 $4,000 Implemented
MA0010 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,400 $6,300 Implemented
MA0010 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,782 $1,260 Implemented
MA0010 # 02 Y:1984 02 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $574 $200 Implemented
MA0010 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $135 Implemented
GT0237 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,160 $2,000 Not Implemented
GT0237 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $574 $970 Implemented
GT0237 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,730 $100 Implemented
CO0014 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $74 $135 Implemented
TN0237 # 03 Y:1984 03 1984 RECOVER WASTE HEAT FROM EQUIPMENT $56 $50 Not Implemented
CO0014 # 04 Y:1984 04 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $730 $2,500 Not Implemented
CO0014 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,292 $300 Implemented
TN0237 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $402 $0 Not Implemented
CO0014 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $561 $300 Implemented
TN0237 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,114 $2,500 Not Implemented
CO0013 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $64 Implemented
KU0147 # 12 Y:1984 12 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $2,377 $4,600 Not Implemented
KU0147 # 07 Y:1984 07 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,806 $1,900 Not Implemented
KU0147 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,520 $1,500 Not Implemented
KU0147 # 14 Y:1984 14 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $337 $600 Not Implemented
KU0147 # 11 Y:1984 11 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,338 $2,000 Not Implemented
KU0147 # 13 Y:1984 13 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $416 $0 Not Implemented