IAC logo
IAC Assessment: KU0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product WHEAT FLOUR
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $5,000,000-$10,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 51,300,000 Pounds
Production Hrs. Annual 6,840
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,200,339 27,067,116 kWh $0.04
Natural Gas $143,559 33,614 MMBtu $4.27
TOTAL ENERGY COSTS $1,343,898
RECOMMENDED SAVINGS* $141,493 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,682
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$43,682
Cost:
$23,000
- - $43,682 10,230 -
-
kWh
$43,682
10,230
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$32,837
Cost:
$12,000
$32,837 - - - $32,837
-
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$18,095
Cost:
$9,000
$18,095 408,265 - - $18,095
408,265
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,122
Cost:
$9,277
$20,122 453,986 - - $20,122
453,986
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,223
Cost:
$500
$10,223 230,657 - - $10,223
230,657
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,700
Cost:
$7,958
- - $5,700 1,335 -
-
kWh
$5,700
1,335
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,806
Cost:
$1,900
$1,806 40,739 - - $1,806
40,739
kWh
-
-
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,520
Cost:
$1,500
$2,520 56,858 - - $2,520
56,858
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,806
Cost:
$3,550
$1,806 40,739 - - $1,806
40,739
kWh
-
-
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$234
Cost:
-
$234 5,275 - - $234
5,275
kWh
-
-
MMBtu
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,338
Cost:
$2,000
$1,338 30,188 - - $1,338
30,188
kWh
-
-
MMBtu
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,377
Cost:
$4,600
$2,377 53,634 - - $2,377
53,634
kWh
-
-
MMBtu
13: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$416
Cost:
-
$416 9,379 - - $416
9,379
kWh
-
-
MMBtu
14: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$337
Cost:
$600
$572 12,896 $(-235) (-55) $572
12,896
kWh
$(-235)
(-55)
MMBtu
TOTAL RECOMMENDED Savings:
$141,493
Cost:
$75,885
$92,346 1,342,616 $49,147 11,510 $92,346
1,342,616
kWh
$49,147
11,510
MMBtu
TOTAL IMPLEMENTED Savings:
$43,682
Cost:
$23,000
- - $43,682 10,230 -
-
kWh
$43,682
10,230
MMBtu