IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0048 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $180 Implemented
MA0048 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $728 $1,700 Not Implemented
MA0048 # 05 Y:1985 05 1985 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,082 $2,095 Not Implemented
MA0048 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $2,710 Not Implemented
MA0048 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,733 $9,000 Not Implemented
MA0048 # 02 Y:1985 02 1985 INSTALL TURBULATORS $636 $2,200 Implemented
UD0180 # 02 Y:1985 02 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,995 $10,000 Implemented
LT0049 # 03 Y:1985 03 1985 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,720 $10,000 Implemented
LT0049 # 04 Y:1985 04 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,800 $1,416 Not Implemented
UD0181 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,612 $200 Implemented
UD0180 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,008 $4,000 Implemented
MA0044 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $760 $1,390 Implemented
UD0181 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,761 $0 Implemented
LT0049 # 02 Y:1985 02 1985 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $19,893 $35,000 Not Implemented
LT0049 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,250 $450 Implemented
MA0044 # 05 Y:1985 05 1985 HEAT WATER WITH EXHAUST HEAT $1,940 $1,466 Implemented
UD0181 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,753 $700 Implemented
LT0049 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,407 $0 Implemented
MA0044 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,311 $1,470 Implemented
UD0180 # 06 Y:1985 06 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,822 $0 Not Implemented
UD0180 # 03 Y:1985 03 1985 REPAIR OR REPLACE STEAM TRAPS $1,559 $2,500 Implemented
UD0180 # 01 Y:1985 01 1985 REDESIGN PROCESS $5,475 $0 Implemented
UD0180 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $657 $700 Implemented
MA0044 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,253 $600 Implemented
MA0044 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $200 Implemented