Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
490
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0392 # 02 Y:1992 | 02 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,241 | $0 | Implemented |
OK0392 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33 | $29 | Not Implemented |
OK0392 # 01 Y:1992 | 01 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,133 | $60,000 | Not Implemented |
OK0392 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $210 | Implemented |
OK0392 # 03 Y:1992 | 03 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,150 | $0 | Implemented |
OK0392 # 05 Y:1992 | 05 | 1992 | INSULATE BARE EQUIPMENT | $133 | $97 | Implemented |
OR0165 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $0 | Not Implemented |
OR0165 # 06 Y:1992 | 06 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $320 | $824 | Implemented |
OR0165 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,788 | $0 | Implemented |
OR0165 # 05 Y:1992 | 05 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $830 | $0 | Implemented |
OR0165 # 01 Y:1992 | 01 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,045 | $500 | Implemented |
OR0165 # 04 Y:1992 | 04 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,074 | $2,250 | Implemented |
IA0040 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,718 | $2,220 | Implemented |
IA0040 # 07 Y:1992 | 07 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $530 | $50 | Implemented |
IA0038 # 02 Y:1992 | 02 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,673 | $2,484 | Not Implemented |
IA0040 # 01 Y:1992 | 01 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,896 | $1,200 | Not Implemented |
IA0040 # 02 Y:1992 | 02 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,369 | $18,000 | Not Implemented |
IA0040 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $890 | $1,701 | Not Implemented |
IA0038 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $693 | $1,875 | Not Implemented |
IA0040 # 04 Y:1992 | 04 | 1992 | INSULATE BARE EQUIPMENT | $1,722 | $4,219 | Not Implemented |
IA0038 # 01 Y:1992 | 01 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,039 | $9,600 | Not Implemented |
IA0040 # 03 Y:1992 | 03 | 1992 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $5,208 | $650 | Not Implemented |
IA0038 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $1,925 | $1,926 | Not Implemented |
IA0038 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $848 | $25 | Not Implemented |
IA0038 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,907 | $150 | Implemented |