Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
533
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0150 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $3,660 | Not Implemented |
OD0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $400 | Not Implemented |
OD0150 # 05 Y:1999 | 05 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $779 | $0 | Not Implemented |
OD0150 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,354 | $9,564 | Not Implemented |
OD0150 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $20 | Not Implemented |
TN0650 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,555 | $1,120 | Not Implemented |
TN0650 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $6,220 | $2,180 | Not Implemented |
TN0650 # 01 Y:1999 | 01 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $150,000 | $30,000 | Not Implemented |
TN0650 # 07 Y:1999 | 07 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $39,640 | $30,500 | Not Implemented |
TN0650 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,400 | $0 | Implemented |
TN0650 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,960 | $16,600 | Not Implemented |
TN0650 # 08 Y:1999 | 08 | 1999 | USE MINIMUM STEAM OPERATING PRESSURE | $5,280 | $0 | Not Implemented |
TN0650 # 03 Y:1999 | 03 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,150 | $0 | Implemented |
TN0650 # 05 Y:1999 | 05 | 1999 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,350 | $36,000 | Not Implemented |
AR0177 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,480 | $1,214 | Not Implemented |
AR0177 # 02 Y:1999 | 02 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,452 | $6,656 | Not Implemented |
AR0177 # 03 Y:1999 | 03 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $48,768 | $92,500 | Not Implemented |
AR0177 # 04 Y:1999 | 04 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $5,480 | $8,000 | Not Implemented |
AR0177 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $384,000 | $400,000 | Not Implemented |
UF0238 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,287 | $0 | Implemented |
UF0238 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $7,893 | Not Implemented |
UF0238 # 04 Y:1999 | 04 | 1999 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $584 | $20 | Implemented |
UF0238 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,894 | $1,361 | Implemented |
UF0238 # 06 Y:1999 | 06 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,767 | $1,605 | Implemented |
UF0238 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,670 | $0 | Implemented |