IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0646 # 08 Y:2002 08 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,334 $9,000 Not Implemented
OK0646 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113 $60 Not Implemented
OK0646 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $1,976 $3,150 Not Implemented
OK0646 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $0 Implemented
OK0646 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $469 $93 Implemented
OK0646 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $1,858 $150 Not Implemented
OK0646 # 03 Y:2002 03 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $659 $0 Implemented
OK0646 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,545 $5,270 Implemented
CO0519 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $5,560 $1,350 Not Implemented
CO0519 # 05 Y:2002 05 2002 INSTALL COMMON HEADER ON COMPRESSORS $770 $2,740 Not Implemented
UU0034 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,759 $800 Not Implemented
UU0034 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,627 $3,621 Not Implemented
UU0034 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,938 $1,000 Not Implemented
UU0034 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $3,790 $2,000 Not Implemented
CO0519 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,972 $5,292 Implemented
CO0519 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $3,156 Implemented
CO0519 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $286 $742 Implemented
UU0034 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,560 $0 Not Implemented
CO0519 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,390 $2,700 Not Implemented
CO0519 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $103 $280 Implemented
SU0148 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $163,907 $767,895 Not Implemented
SU0148 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $105 $0 Implemented
SU0148 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $25,533 $0 Implemented
SU0148 # 03 Y:2002 03 2002 MODIFY WORKLOAD $14,400 $20,000 Implemented
SU0148 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,438 $320 Not Implemented