Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
454
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0958 # 13 Y:2016 | 13 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $309,693 | $1,927,657 | Not Implemented |
OK0958 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,755 | $0 | Not Implemented |
OK0958 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,623 | $520 | Not Implemented |
OK0958 # 05 Y:2016 | 05 | 2016 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,954 | $1,227 | Not Implemented |
OK0958 # 03 Y:2016 | 03 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $7,914 | $3,250 | Implemented |
OK0958 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,735 | $9,149 | Implemented |
OK0958 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,461 | $2,000 | Implemented |
OK0958 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,160 | $17,885 | Not Implemented |
OK0958 # 08 Y:2016 | 08 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $2,283 | $4,147 | Not Implemented |
OK0958 # 11 Y:2016 | 11 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,955 | $100,000 | Implemented |
OK0958 # 12 Y:2016 | 12 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,996 | $0 | Implemented |
OK0958 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,455 | $0 | Implemented |
OK0958 # 10 Y:2016 | 10 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,151 | $70,000 | Implemented |
WM0099 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $2,414 | $4,360 | Not Implemented |
WM0099 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $358 | $120 | Implemented |
WM0099 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,368 | $2,600 | Not Implemented |
WM0099 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $733 | $2,000 | Not Implemented |
WM0099 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $902 | $2,200 | Not Implemented |
WM0099 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $861 | $900 | Not Implemented |
WM0099 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $12,056 | Not Implemented |
WM0099 # 01 Y:2016 | 01 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,017 | $11,200 | Not Implemented |
WM0099 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $685 | $481 | Not Implemented |
WM0099 # 11 Y:2016 | 11 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $344 | $0 | Implemented |
WM0099 # 12 Y:2016 | 12 | 2016 | INSULATE BARE EQUIPMENT | $274 | $315 | Implemented |
WM0099 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,528 | $0 | Not Implemented |