IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,408

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0279 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,676 $8,591 Implemented
UA0279 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,760 $1,407 Implemented
UA0279 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,760 $1,000 Implemented
UA0279 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,228 $2,262 Implemented
NL0086 # 03 Y:2023 03 2023 METER WASTE WATER $4,239 $1,348 Implemented
NL0086 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $6,202 $6,211 Implemented
LE0551 # 03 Y:2023 03 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $111,339 $525,000 Implemented
LE0551 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $69,768 $5,000 Implemented
LS2311 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,795 $560 Implemented
LS2311 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,014 $39,200 Implemented
LS2311 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,096 $3,700 Implemented
LS2311 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,616 $25 Implemented
IC0278 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,040 $600 Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
MI0420 # 04 Y:2023 04 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,620 $52,100 Implemented
MI0420 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,309 $1,980 Implemented
MI0420 # 09 Y:2023 09 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,456 $280 Implemented
MI0420 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $15,797 $0 Implemented
MI0420 # 10 Y:2023 10 2023 PAY UTILITY BILLS ON TIME $111 $0 Implemented
LE0543 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $839 $100 Implemented
LE0543 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,298 $8,400 Implemented
LE0543 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,075 $13,169 Implemented
LE0543 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,200 $9,000 Implemented
LE0543 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $210 $760 Implemented
NL0075 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,652 Implemented