IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,402

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0030 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $5,420 $1,072 Implemented
CO0030 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $751 $400 Implemented
CO0030 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $200 Implemented
CO0030 # 08 Y:1985 08 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,640 $1,485 Implemented
CO0030 # 09 Y:1985 09 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,211 $350 Implemented
CO0025 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,791 $300 Implemented
KU0119 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,545 $16,000 Implemented
KU0119 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,150 $3,590 Implemented
KU0119 # 07 Y:1984 07 1984 OPERATE BOILERS ON HIGH FIRE SETTING $2,034 $50 Implemented
KU0119 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,240 $0 Implemented
KU0119 # 09 Y:1984 09 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $982 $200 Implemented
KU0119 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
KU0119 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $264 $150 Implemented
TN0192 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,800 $0 Implemented
TN0192 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $325 $12,000 Implemented
TN0192 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $940 $200 Implemented
GT0203 # 04 Y:1983 04 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,310 $9,000 Implemented
OK0096 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $318 Implemented
OK0096 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,949 $725 Implemented
OK0090 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $1,104 $1,103 Implemented
OK0090 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,010 $695 Implemented
OK0090 # 04 Y:1983 04 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $141 $196 Implemented
OK0090 # 05 Y:1983 05 1983 REDUCE SCRAP PRODUCTION $1,351 $5,000 Implemented
OK0043 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58 $34 Implemented
OK0043 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33 $600 Implemented