Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1008 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,177 | $165,000 | Implemented |
UD1008 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,386 | $0 | Implemented |
UD1008 # 09 Y:2019 | 09 | 2019 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $28,777 | $27,800 | Not Implemented |
UD1008 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $8,111 | $13,455 | Not Implemented |
UD1008 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,191 | $0 | Implemented |
UD1008 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $3,650 | Implemented |
UD1008 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,896 | $500 | Implemented |
UD1008 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,245 | $0 | Implemented |
UD1008 # 07 Y:2019 | 07 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $5,658 | $0 | Not Implemented |
UD1008 # 08 Y:2019 | 08 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $3,596 | $0 | Not Implemented |
UD1008 # 03 Y:2019 | 03 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $10,457 | $20,400 | Not Implemented |
UD1007 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $924 | $0 | Not Implemented |
UD1007 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,235 | $23,550 | Implemented |
UD1007 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,710 | $34,800 | Not Implemented |
UD1007 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,204 | $0 | Implemented |
UD1007 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,535 | $500 | Not Implemented |
UD1007 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,566 | $4,400 | Not Implemented |
UD1007 # 05 Y:2019 | 05 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,980 | $0 | Implemented |
UD1007 # 03 Y:2019 | 03 | 2019 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $87,749 | $5,000 | Not Implemented |
UD1007 # 04 Y:2019 | 04 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $80,784 | $10,000 | Not Implemented |
UD1007 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $21,932 | $0 | Not Implemented |
UD1007 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $1,000 | Not Implemented |
UD0969 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,357 | $30 | Implemented |
UD0969 # 12 Y:2017 | 12 | 2017 | INSTALL TURBULATORS | $795 | $1,250 | Not Implemented |
UD0969 # 11 Y:2017 | 11 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,502 | $844 | Implemented |