Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,952
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0392 # 08 Y:1989 | 08 | 1989 | USE OPTIMUM THICKNESS INSULATION | $14,830 | $22,000 | Not Implemented |
GT0392 # 09 Y:1989 | 09 | 1989 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $41,430 | $16,000 | Implemented |
GT0392 # 10 Y:1989 | 10 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,490 | $27,500 | Not Implemented |
GT0392 # 11 Y:1989 | 11 | 1989 | USE OPTIMUM THICKNESS INSULATION | $740 | $1,190 | Not Implemented |
GT0392 # 12 Y:1989 | 12 | 1989 | REDUCE OR ELIMINATE WASTE | $24,430 | $0 | Implemented |
OK0297 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,160 | $5,523 | Not Implemented |
OK0297 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,738 | $1,478 | Implemented |
OK0297 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $233 | $123 | Implemented |
OK0297 # 04 Y:1989 | 04 | 1989 | OPTIMIZE PLANT POWER FACTOR | $1,607 | $2,500 | Not Implemented |
OK0297 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,788 | $0 | Implemented |
OK0297 # 06 Y:1989 | 06 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,017 | $2,289 | Implemented |
KU0295 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $576 | Implemented |
KU0295 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,793 | $3,300 | Implemented |
KU0295 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,741 | $5,300 | Implemented |
KU0295 # 04 Y:1989 | 04 | 1989 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,301 | $150 | Implemented |
KU0295 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,066 | $0 | Implemented |
KU0295 # 06 Y:1989 | 06 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $238 | $200 | Not Implemented |
KU0295 # 07 Y:1989 | 07 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $120 | $200 | Not Implemented |
KU0295 # 08 Y:1989 | 08 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,182 | $500 | Implemented |
KU0287 # 01 Y:1989 | 01 | 1989 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,331 | $4,000 | Not Implemented |
KU0287 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,271 | $400 | Implemented |
KU0287 # 03 Y:1989 | 03 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,214 | $4,800 | Not Implemented |
KU0287 # 04 Y:1989 | 04 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,735 | $2,700 | Not Implemented |
KU0287 # 05 Y:1989 | 05 | 1989 | INSTALL TURBULATORS | $3,748 | $2,160 | Not Implemented |
OK0292 # 01 Y:1989 | 01 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,836 | $4,300 | Not Implemented |