Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,939
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0072 # 09 Y:2011 | 09 | 2011 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $24,840 | $2,500 | Implemented |
DL0072 # 10 Y:2011 | 10 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,520 | $65,000 | Not Implemented |
DL0072 # 11 Y:2011 | 11 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $26,800 | $5,500 | Not Implemented |
DL0072 # 12 Y:2011 | 12 | 2011 | REDUCE VENTILATION AIR | $44,740 | $4,400 | Implemented |
DL0072 # 13 Y:2011 | 13 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,200 | $6,125 | Implemented |
DL0072 # 14 Y:2011 | 14 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,009 | $1,045 | Not Implemented |
OK0811 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $127,513 | $58,126 | Not Implemented |
OK0811 # 02 Y:2011 | 02 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,432 | $60,934 | Not Implemented |
OK0811 # 03 Y:2011 | 03 | 2011 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,854 | $2,600 | Implemented |
OK0811 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,132 | $60,156 | Not Implemented |
OK0811 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,716 | $11,429 | Not Implemented |
OK0811 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $160 | $944 | Implemented |
OK0811 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,372 | $270,346 | Not Implemented |
OK0811 # 08 Y:2011 | 08 | 2011 | MINIMIZE WATER USAGE | $159,930 | $46,397 | Not Implemented |
OK0811 # 09 Y:2011 | 09 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $61,620 | $459 | Not Implemented |
OK0811 # 10 Y:2011 | 10 | 2011 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $22,682 | $0 | Implemented |
GT0880 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,831 | $1,250 | Implemented |
GT0880 # 02 Y:2011 | 02 | 2011 | USE SYNTHETIC LUBRICANT | $13,152 | $0 | Not Implemented |
GT0880 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,390 | $244 | Not Implemented |
GT0880 # 04 Y:2011 | 04 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $75,872 | $100,115 | Implemented |
GT0880 # 05 Y:2011 | 05 | 2011 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $70,097 | $17,000 | Implemented |
GT0880 # 06 Y:2011 | 06 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,994 | $5,000 | Not Implemented |
GT0880 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,232 | $38,000 | Not Implemented |
MA0664 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $133,570 | $55,950 | Implemented |
MA0664 # 02 Y:2010 | 02 | 2010 | MINIMIZE WATER USAGE | $26,438 | $62,000 | Not Implemented |