IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0005 # 12 Y:2007 12 2007 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $34,728 $1,615 Not Implemented
MI0147 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,581 $16,000 Implemented
MI0147 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,498 $1,750 Implemented
MI0147 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,305 $7,878 Implemented
MI0147 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,950 $1,074 Not Implemented
MI0147 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $30 Not Implemented
UD0763 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,135 $5,242 Implemented
UD0763 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,994 $8,900 Implemented
UD0763 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,945 $57,910 Not Implemented
UD0763 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,551 $8,100 Not Implemented
UD0763 # 05 Y:2007 05 2007 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,275 $0 Not Implemented
UD0763 # 06 Y:2007 06 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,835 $3,670 Not Implemented
NC0362 # 01 Y:2007 01 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $43,646 $70,525 Not Implemented
NC0362 # 02 Y:2007 02 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $75,775 $79,525 Not Implemented
NC0362 # 03 Y:2007 03 2007 DEVELOP A REPAIR/REPLACE POLICY $3,512 $3,546 Not Implemented
NC0362 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,160 $50 Not Implemented
NC0362 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $537 Not Implemented
NC0362 # 06 Y:2007 06 2007 MAKE A NEW BY-PRODUCT $655,523 $2,000,000 Not Implemented
IC0127 # 01 Y:2007 01 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,659 $0 Implemented
IC0127 # 02 Y:2007 02 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $800 $440 Implemented
IC0127 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,063 $51,889 Implemented
IC0127 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $1,026 Implemented
IC0127 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,459 $0 Implemented
IC0127 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $20,976 Implemented
IC0127 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,818 $886 Implemented