IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0699 # 08 Y:2000 08 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $505 $900 n/a
GT0699 # 09 Y:2000 09 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,182 $31,500 n/a
GT0699 # 10 Y:2000 10 2000 COMBINE UTILITY METERS $21,948 $0 n/a
GT0699 # 11 Y:2000 11 2000 MINIMIZE WATER USAGE $207 $205 n/a
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
CO0469 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $860 $2,270 Not Implemented
CO0469 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $590 $1,510 Implemented
CO0469 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $0 Implemented
CO0469 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $730 $50 Implemented
CO0469 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $27,300 $20,000 Not Implemented
CO0469 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $22,100 $9,000 Implemented
CO0469 # 08 Y:2000 08 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $1,200 Implemented
IA0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,434 $13,248 Implemented
IA0248 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,780 $0 Implemented
IA0248 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $0 Not Implemented
IA0248 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $125 Implemented
OD0162 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,184 $2,257 Not Implemented
OD0162 # 02 Y:2000 02 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,775 $1,870 Not Implemented
UF0251 # 01 Y:2000 01 2000 REPAIR AND ELIMINATE STEAM LEAKS $786 $440 Implemented
UF0251 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $228 Implemented
UF0251 # 03 Y:2000 03 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,447 $50 Implemented
UF0251 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $220 Implemented
UF0251 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $616 $0 Implemented
UF0251 # 06 Y:2000 06 2000 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $44,000 $3,034 Implemented
UF0251 # 07 Y:2000 07 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $940 $0 Not Implemented