IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0074 # 09 Y:1995 09 1995 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $387 $25 Implemented
SF0074 # 10 Y:1995 10 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $554 $0 Implemented
KG0035 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,463 $10,130 Implemented
KG0035 # 02 Y:1995 02 1995 USE SYNTHETIC LUBRICANT $2,103 $0 Not Implemented
KG0035 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,212 $750 Not Implemented
KG0035 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $398 Implemented
OD0040 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,870 $10,484 Not Implemented
OD0040 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,135 $8,610 Implemented
OD0040 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,814 $3,630 Implemented
OD0040 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $13,414 $54,257 Not Implemented
OD0040 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $882 $780 Not Implemented
OD0040 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $800 Implemented
DS0033 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $2,709 Implemented
DS0033 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,911 $8,264 Implemented
DS0033 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $300 Not Implemented
DS0033 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,479 $2,413 Not Implemented
DS0033 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,377 $104 Not Implemented
DS0033 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $122 $112 Implemented
DS0033 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $1,492 $3,107 Not Implemented
DS0033 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $850 $284 Not Implemented
DS0033 # 09 Y:1995 09 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,890 $268,600 Not Implemented
DS0033 # 10 Y:1995 10 1995 RECOVER WASTE HEAT FROM EQUIPMENT $6,581 $16,000 Not Implemented
OD0031 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,274 $45,837 Not Implemented
OD0031 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,159 $2,803 Not Implemented
OD0031 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,349 $66,206 Not Implemented