IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0398 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,472 $3,777 Not Implemented
GT0398 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $634 $0 Not Implemented
GT0398 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,294 $15,320 Not Implemented
GT0398 # 06 Y:1990 06 1990 REPAIR AND ELIMINATE STEAM LEAKS $1,275 $2,843 Not Implemented
GT0398 # 07 Y:1990 07 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $0 Not Implemented
GT0398 # 08 Y:1990 08 1990 ELIMINATE LEAKS IN WATER LINES AND VALVES $340 $200 Not Implemented
GT0398 # 09 Y:1990 09 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,600 $1,500 Not Implemented
GT0398 # 10 Y:1990 10 1990 RECOVER WASTE HEAT FROM EQUIPMENT $19,050 $76,500 Not Implemented
OR0076 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,574 $1,000 Implemented
OR0076 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,005 $652 Not Implemented
OR0076 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $655 $345 Implemented
OR0076 # 04 Y:1990 04 1990 DIRECT WARMEST AIR TO COMBUSTION INTAKE $658 $390 Not Implemented
OR0076 # 05 Y:1990 05 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,222 $3,600 Not Implemented
OR0076 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $206 $333 Implemented
OR0076 # 07 Y:1990 07 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,585 $6,190 Implemented
OR0076 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $434 $1,118 Implemented
OR0076 # 09 Y:1990 09 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $486 $1,553 Not Implemented
MA0169 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,187 $1,752 Not Implemented
MA0169 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $740 Implemented
MA0169 # 03 Y:1989 03 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,087 $0 Implemented
MA0169 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $0 Implemented
MA0169 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $405 $0 Not Implemented
GT0390 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,040 $0 Implemented
GT0390 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $2,400 Implemented
GT0390 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $534 $1,020 Implemented