Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0272 # 10 Y:2003 | 10 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,390 | $200 | Implemented |
WV0272 # 09 Y:2003 | 09 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,730 | $1,700 | Not Implemented |
WV0272 # 07 Y:2003 | 07 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,209 | $1,789 | Implemented |
SU0164 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $29 | Implemented |
SU0164 # 07 Y:2003 | 07 | 2003 | REDESIGN PROCESS | $6,861 | $270 | Implemented |
SU0164 # 14 Y:2003 | 14 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $198 | $150 | Not Implemented |
SU0164 # 05 Y:2003 | 05 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $8,721 | $0 | Implemented |
SU0164 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,096 | $55,580 | Implemented |
SU0164 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $115,419 | $348,540 | Implemented |
SU0164 # 03 Y:2003 | 03 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,000 | $76,518 | Not Implemented |
SU0164 # 09 Y:2003 | 09 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,293 | $955 | Implemented |
SU0164 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,485 | $700 | Implemented |
SU0164 # 01 Y:2003 | 01 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $141,258 | $1,171,875 | Not Implemented |
SU0164 # 06 Y:2003 | 06 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $7,910 | $10,000 | Not Implemented |
SU0164 # 10 Y:2003 | 10 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $847 | $1,744 | Implemented |
SU0164 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $550 | $0 | Implemented |
SU0164 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $723 | $608 | Implemented |
SF0262 # 01 Y:2003 | 01 | 2003 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $144,108 | $26,738 | Not Implemented |
SF0262 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,281 | $564 | Not Implemented |
SF0262 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,464 | $5,555 | Implemented |
SF0262 # 05 Y:2003 | 05 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,013 | $2,748 | Implemented |
SF0262 # 06 Y:2003 | 06 | 2003 | USE PHOTOCELL CONTROLS | $355 | $360 | Not Implemented |
SF0262 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $2,530 | $3,638 | Implemented |
SF0262 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,502 | $19,608 | Not Implemented |
SF0262 # 09 Y:2003 | 09 | 2003 | REPLACE BOILER | $39,608 | $155,089 | Not Implemented |