IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
SIC 2011 Meat Packing Plants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0345 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,734 $8,430 Implemented
UF0345 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $519 $525 Implemented
UF0345 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,882 $3,496 Implemented
BD0262 # 01 Y:2004 01 2004 INSTALL TURBULATORS $40,923 $2,400 Implemented
BD0262 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,994 $3,000 Implemented
BD0262 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,116 $8,920 Implemented
BD0262 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,267 $1,200 Implemented
BD0262 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,261 $850 Implemented
BD0262 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $287 $286 Implemented
BD0262 # 13 Y:2004 13 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,000 $300 Implemented
BD0262 # 14 Y:2004 14 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,289 $5,500 Implemented
UF0340 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,590 $48,289 Implemented
UF0340 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $10,480 $40,000 Implemented
UF0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,682 $400 Implemented
UF0340 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,678 $7,900 Implemented
WV0272 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,533 $9,240 Implemented
WV0272 # 13 Y:2003 13 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $80 Implemented
WV0272 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,209 $1,789 Implemented
WV0272 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,519 $675 Implemented
WV0272 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,390 $200 Implemented
WV0272 # 12 Y:2003 12 2003 USE SYNTHETIC LUBRICANT $1,058 $240 Implemented
WV0272 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $12,184 $721 Implemented
WV0272 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,265 $980 Implemented
WV0272 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $4,369 $621 Implemented
IA0305 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,721 $0 Implemented