IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

774

matching recommendations
Reset
SIC 2011 Meat Packing Plants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0071 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $407 $2,521 Implemented
NL0071 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $4,500 Implemented
NL0071 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,139 $8,000 Not Implemented
NL0071 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $106,955 $72,150 Implemented
NL0071 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,879 $30,410 Implemented
NL0071 # 01 Y:2022 01 2022 REPLACE BOILER $280,847 $220,000 Not Implemented
MZ0333 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,542 $3,330 n/a
MZ0333 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,379 $21,815 n/a
MZ0333 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,752 $66 n/a
MZ0333 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,733 $1,330 n/a
WV0598 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $7,292 $6,768 Implemented
WV0598 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $564 $613 Implemented
WV0598 # 02 Y:2020 02 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $28,134 $48,344 Not Implemented
WV0598 # 03 Y:2020 03 2020 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $8,920 $11,220 Not Implemented
WV0598 # 01 Y:2020 01 2020 INSTALL SENSORS TO DETECT DEFECTS $30,600 $10,470 Not Implemented
WV0598 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $916 $1,021 Implemented
WV0598 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,467 $3,170 Implemented
NL0039 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,739 $1,600 Implemented
NL0039 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,367 $39,000 Implemented
NL0039 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $15,324 $44 Implemented
NL0039 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,128 $2,497 Implemented
NL0039 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $10,832 $1,127 Implemented
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented