Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
774
matching recommendationsSIC | 2011 | Meat Packing Plants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,139 | $8,000 | Not Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $280,847 | $220,000 | Not Implemented |
MZ0333 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,542 | $3,330 | n/a |
MZ0333 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,379 | $21,815 | n/a |
MZ0333 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,752 | $66 | n/a |
MZ0333 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,733 | $1,330 | n/a |
WV0598 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $7,292 | $6,768 | Implemented |
WV0598 # 07 Y:2020 | 07 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $564 | $613 | Implemented |
WV0598 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $28,134 | $48,344 | Not Implemented |
WV0598 # 03 Y:2020 | 03 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $8,920 | $11,220 | Not Implemented |
WV0598 # 01 Y:2020 | 01 | 2020 | INSTALL SENSORS TO DETECT DEFECTS | $30,600 | $10,470 | Not Implemented |
WV0598 # 06 Y:2020 | 06 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $916 | $1,021 | Implemented |
WV0598 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $1,467 | $3,170 | Implemented |
NL0039 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,739 | $1,600 | Implemented |
NL0039 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $36,367 | $39,000 | Implemented |
NL0039 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $15,324 | $44 | Implemented |
NL0039 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,128 | $2,497 | Implemented |
NL0039 # 04 Y:2019 | 04 | 2019 | MINIMIZE WATER USAGE | $10,832 | $1,127 | Implemented |
IC0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,997 | $8,799 | Not Implemented |
IC0218 # 02 Y:2019 | 02 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $63,690 | $6,300 | Not Implemented |
IC0218 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,151 | $14,700 | Not Implemented |