Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,407
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0897 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $0 | n/a |
AM0897 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,420 | $45,905 | n/a |
AM0897 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $100 | n/a |
AM0897 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $4,860 | n/a |
AM0897 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $460 | $98 | n/a |
AM0897 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $520 | $102 | n/a |
AM0897 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $300 | $22 | n/a |
AM0897 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,400 | $32,265 | n/a |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
LE0551 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $203 | $300 | Not Implemented |
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0075 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,755 | $28,900 | Not Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
NL0075 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $635 | $575 | Not Implemented |
OK1082 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,847 | $323 | Implemented |
OK1082 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,804 | $14,599 | Implemented |
OK1082 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,649 | $2,715 | Implemented |
OK1082 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,243 | $0 | Not Implemented |
OK1082 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,696 | $230,880 | Not Implemented |
OK1082 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,475 | $36,319 | Implemented |
NL0064 # 01 Y:2022 | 01 | 2022 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $79,442 | $292,000 | Implemented |
NL0064 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $204 | $130 | Implemented |
NL0064 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $331 | $90 | Implemented |