IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

662

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0396 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,228 $600 Implemented
IA0396 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $3,899 Implemented
IA0396 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,661 Implemented
IA0396 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $810 $83 Implemented
IA0396 # 07 Y:2006 07 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,338 $500 Implemented
IA0396 # 08 Y:2006 08 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,234 $1,702 Implemented
LE0238 # 03 Y:2006 03 2006 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $335,810 $500 Implemented
LE0238 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,103 $2,500 Implemented
LE0238 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,870 $3,000 Implemented
LE0238 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,609 $45,000 Implemented
LE0238 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,065 $90 Implemented
IA0380 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $25 Implemented
IA0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $215 Implemented
IA0380 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $262 $879 Implemented
LL0236 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,322 $4,300 Implemented
LL0236 # 02 Y:2005 02 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,274 $9,000 Implemented
LL0236 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $3,312 $500 Implemented
LL0236 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $300 Implemented
LL0236 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $295 $100 Implemented
UM0283 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,024 $300 Implemented
UM0283 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,056 $2,500 Implemented
UM0283 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,568 $6,878 Implemented
CO0556 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,670 $340 Implemented
CO0556 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $765 $926 Implemented
CO0556 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $460 $780 Implemented