IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0909 # 13 Y:2015 13 2015 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $265,571 $1,832,665 Not Implemented
OK0909 # 12 Y:2015 12 2015 RECOVER WASTE HEAT FROM EQUIPMENT $43,900 $87,882 Not Implemented
OK0909 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,077 $0 Implemented
OK0909 # 02 Y:2015 02 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,799 $7,680 Implemented
OK0909 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,249 $8,691 Not Implemented
OK0909 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $3,904 Implemented
OK0909 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,514 $34,454 Not Implemented
OK0909 # 06 Y:2015 06 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,211 $2,000 Implemented
OK0909 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $300 $377 Not Implemented
OK0909 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,856 $41,000 Implemented
OK0909 # 09 Y:2015 09 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,404 $824 Implemented
OK0909 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,060 $1,875 Implemented
OK0909 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $25,364 $2,846 Implemented
KU0279 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,571 $0 Implemented
KU0279 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,158 $32,000 Implemented
KU0279 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $400 $500 Implemented
KU0279 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $774 $550 Implemented
KU0279 # 04 Y:1989 04 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $730 $0 Implemented
KU0279 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $922 $2,030 Not Implemented
KU0279 # 06 Y:1989 06 1989 IMPROVE LUBRICATION PRACTICES $11,699 $0 Not Implemented
KU0279 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,640 $17,000 Not Implemented
KU0279 # 08 Y:1989 08 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,432 $21,000 Not Implemented
KU0061 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,078 $3,361 Not Implemented
KU0061 # 05 Y:1982 05 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,767 $9,000 Not Implemented
KU0061 # 04 Y:1982 04 1982 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,660 $3,800 Not Implemented