IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0969 # 11 Y:2017 11 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $1,502 $844 Implemented
UD0969 # 10 Y:2017 10 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,536 $6,000 Not Implemented
UD0969 # 08 Y:2017 08 2017 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $6,275 $5,250 Not Implemented
UD0969 # 07 Y:2017 07 2017 REDUCE EXCESS STEAM BLEEDING $6,926 $1,050 Not Implemented
UD0969 # 06 Y:2017 06 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $22,591 $63,800 Implemented
UD0969 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $1,000 Implemented
UD0969 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $2,500 Not Implemented
UD0969 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,188 $30 Implemented
UD0969 # 02 Y:2017 02 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,357 $30 Implemented
UD0969 # 01 Y:2017 01 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,613 $30 Implemented
UD0969 # 09 Y:2017 09 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,251 $30 Implemented
UD0880 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,581 $15,000 Implemented
UD0880 # 01 Y:2013 01 2013 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $37,553 $100,000 Not Implemented
UD0880 # 02 Y:2013 02 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,784 $5,000 Implemented
UD0880 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $12,462 $0 Implemented
UD0880 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,196 $3,400 Implemented
UD0880 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,656 $0 Implemented
UD0880 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,120 $1,000 Implemented
UD0880 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $35,463 $15,000 Implemented
UD0880 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $25,120 $4,600 Implemented
UD0880 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,091 $25,000 Implemented
UD0880 # 13 Y:2013 13 2013 INSULATE BARE EQUIPMENT $3,572 $1,221 Implemented
UD0880 # 14 Y:2013 14 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,352 $0 Implemented
UD0880 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,315 $8,000 Implemented
UD0880 # 12 Y:2013 12 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,170 $8,000 Implemented