Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,416
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0463 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,078 | $23,140 | Implemented |
OK0463 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,020 | $3,000 | Implemented |
OK0463 # 03 Y:1995 | 03 | 1995 | UPGRADE CONTROLS ON COMPRESSORS | $4,172 | $2,500 | Not Implemented |
OK0463 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $941 | $1,315 | Not Implemented |
OK0463 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,357 | $1,535 | Implemented |
OK0463 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,526 | $19,716 | Implemented |
OK0463 # 07 Y:1995 | 07 | 1995 | USE OTHER WASTE CONCENTRATION METHODS | $25,799 | $50,000 | Implemented |
OR0230 # 01 Y:1995 | 01 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,029 | $40 | Implemented |
OR0230 # 02 Y:1995 | 02 | 1995 | ADJUST BURNERS FOR EFFICIENT OPERATION | $660 | $1,000 | Implemented |
OR0230 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $994 | $2,600 | Not Implemented |
OR0230 # 04 Y:1995 | 04 | 1995 | TREAT AND REUSE RINSE WATERS | $463 | $0 | Not Implemented |
OR0230 # 05 Y:1995 | 05 | 1995 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $12,942 | $1,372 | Not Implemented |
OD0019 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,609 | $10,292 | Implemented |
OD0019 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $301 | $1,102 | Implemented |
OD0019 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $189 | $416 | Implemented |
OD0019 # 04 Y:1995 | 04 | 1995 | AVOID FROST FORMATION ON EVAPORATORS | $11,972 | $16,500 | Not Implemented |
OD0019 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,306 | $8,136 | Not Implemented |
IA0097 # 01 Y:1994 | 01 | 1994 | UPGRADE OBSOLETE EQUIPMENT | $146,835 | $367,000 | Not Implemented |
IA0097 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,716 | $4,000 | Implemented |
IA0097 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,939 | $355 | Implemented |
IA0097 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,091 | $3,634 | Not Implemented |
IA0097 # 05 Y:1994 | 05 | 1994 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,272 | $1,686 | Not Implemented |
IA0097 # 06 Y:1994 | 06 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $6,851 | $995 | Not Implemented |
IA0097 # 07 Y:1994 | 07 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,661 | $1,200 | Implemented |
IA0097 # 08 Y:1994 | 08 | 1994 | INSULATE BARE EQUIPMENT | $144 | $313 | Not Implemented |