IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0087 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $33,600 Implemented
SF0087 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,081 $3,839 Implemented
SF0087 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $1,101 $960 Implemented
SF0087 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $2,210 $2,600 Implemented
SF0087 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,251 $1,265 Implemented
SF0087 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,036 $0 Not Implemented
SF0087 # 07 Y:1996 07 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $353 $613 Not Implemented
SF0087 # 08 Y:1996 08 1996 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,377 $14,820 Not Implemented
SF0087 # 09 Y:1996 09 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $79,567 $140,000 Not Implemented
SF0087 # 10 Y:1996 10 1996 OPTIMIZE PLANT POWER FACTOR $1,979 $2,231 Implemented
SF0087 # 11 Y:1996 11 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,059 $5,330 Implemented
SF0087 # 12 Y:1996 12 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,369 $4,210 Implemented
SF0087 # 13 Y:1996 13 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,603 $1,329 Not Implemented
SF0087 # 14 Y:1996 14 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $868 $1,375 Not Implemented
SF0087 # 15 Y:1996 15 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,998 $3,435 Implemented
SF0087 # 16 Y:1996 16 1996 METER WASTE WATER $2,085 $4,500 Not Implemented
SF0074 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,480 $1,158 Not Implemented
SF0074 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,747 $5,369 Not Implemented
SF0074 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,044 $262 Implemented
SF0074 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $600 Not Implemented
SF0074 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $648 $0 Implemented
SF0074 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $685 $75 Not Implemented
SF0074 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,143 $2,542 Not Implemented
SF0074 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,174 $150 Implemented
SF0074 # 09 Y:1995 09 1995 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $387 $25 Implemented