IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1802 # 11 Y:2018 11 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $42,791 $10,639 Not Implemented
UK1802 # 10 Y:2018 10 2018 USE MINIMUM STEAM OPERATING PRESSURE $372 $0 Not Implemented
UK1802 # 09 Y:2018 09 2018 INSULATE BARE EQUIPMENT $439 $224 Not Implemented
UK1802 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,127 $0 Not Implemented
UK1802 # 07 Y:2018 07 2018 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $3,271 $679 Not Implemented
UK1802 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,227 $507 Not Implemented
UK1802 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,533 $0 Not Implemented
UK1802 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,905 $1,700 Not Implemented
UK1802 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,079 $2,780 Not Implemented
UK1802 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,526 $19,379 Not Implemented
UK1802 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $35,828 $14,140 Not Implemented
UD0797 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,835 $75,000 Not Implemented
UD0797 # 09 Y:2009 09 2009 DISCONNECT BALLASTS $858 $0 Implemented
UD0797 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $4,088 $3,150 Not Implemented
UD0797 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,034 $1,000 Implemented
UD0797 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,393 $75,000 Not Implemented
UD0797 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,395 $6,000 Not Implemented
UD0797 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,489 $48,750 Implemented
UD0797 # 02 Y:2009 02 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,511 $5,000 Not Implemented
UD0797 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $141,216 $250,000 Not Implemented
UD0204 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,358 $250 Not Implemented
UD0204 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $668 $2,000 Implemented
UD0204 # 06 Y:1986 06 1986 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,924 $1,600 Not Implemented
UD0204 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $331 Implemented
UD0204 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,866 $31,210 Implemented