IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0506 # 06 Y:2006 06 2006 $2,300 $0 Implemented
OR0506 # 05 Y:2006 05 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $3,600 Implemented
OR0506 # 04 Y:2006 04 2006 $11,400 $2,700 Implemented
OR0506 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Implemented
OR0506 # 02 Y:2006 02 2006 $9,000 $2,100 Implemented
OR0506 # 01 Y:2006 01 2006 $360,000 $2,100 Implemented
OR0462 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $1,500 Implemented
OR0462 # 02 Y:2004 02 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,600 $300 Not Implemented
OR0462 # 01 Y:2004 01 2004 $520,020 $178,400 Implemented
OR0208 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,604 $3,634 Not Implemented
OR0208 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,482 $0 Not Implemented
OR0208 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,373 $18,725 Not Implemented
OR0208 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $588 $1,470 Not Implemented
OR0208 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,662 $6,842 Not Implemented
OR0208 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $288 $500 Not Implemented
OR0003 # 01 Y:1987 01 1987 USE MINIMUM STEAM OPERATING PRESSURE $486 $0 Implemented
OR0003 # 11 Y:1987 11 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $470 $927 Implemented
OR0003 # 10 Y:1987 10 1987 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,940 $7,000 Implemented
OR0003 # 09 Y:1987 09 1987 OPTIMIZE PLANT POWER FACTOR $1,632 $2,260 Not Implemented
OR0003 # 08 Y:1987 08 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $484 $300 Implemented
OR0003 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $632 Not Implemented
OR0003 # 06 Y:1987 06 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $246 Implemented
OR0003 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $432 $190 Implemented
OR0003 # 04 Y:1987 04 1987 MINIMIZE WATER USAGE $2,826 $10 Implemented
OR0003 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $2,130 $447 Implemented