Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
718
matching recommendationsSIC | 2015 | Poultry Slaughtering And Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0081 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,860 | $38,323 | Not Implemented |
UA0081 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $1,632 | $1,609 | Implemented |
UA0081 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,682 | $6,975 | Not Implemented |
UA0081 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,459 | $480 | Implemented |
UA0081 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,206 | $5,100 | Implemented |
UA0081 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $2,481 | $2,210 | Implemented |
UA0081 # 07 Y:2012 | 07 | 2012 | ELIMINATE/REDUCE AN OPERATION | $119 | $85 | Not Implemented |
MS0390 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,662 | $51,336 | Not Implemented |
MS0390 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $24,932 | Not Implemented |
MS0390 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,384 | $351 | Not Implemented |
DL0081 # 01 Y:2012 | 01 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $323,076 | $500,000 | Not Implemented |
DL0081 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,870 | $24,400 | Implemented |
DL0081 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,801 | $36,000 | Implemented |
DL0081 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,818 | $54,000 | Implemented |
DL0081 # 05 Y:2012 | 05 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $18,222 | $42,000 | Not Implemented |
DL0081 # 06 Y:2012 | 06 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,850 | $4,500 | Not Implemented |
DL0081 # 07 Y:2012 | 07 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,257 | $28,000 | Not Implemented |
DL0081 # 08 Y:2012 | 08 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $16,536 | $8,900 | Not Implemented |
DL0081 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,536 | $25,000 | Not Implemented |
DL0081 # 10 Y:2012 | 10 | 2012 | REDUCE VENTILATION AIR | $26,354 | $4,500 | Implemented |
DL0081 # 11 Y:2012 | 11 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,412 | $720 | Not Implemented |
DL0072 # 01 Y:2011 | 01 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $282,000 | $500,000 | Not Implemented |
DL0072 # 02 Y:2011 | 02 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $136,800 | $100,000 | Not Implemented |
DL0072 # 03 Y:2011 | 03 | 2011 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $19,600 | $5,000 | Not Implemented |
DL0072 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $44,400 | $2,000 | Not Implemented |