IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0081 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,860 $38,323 Not Implemented
UA0081 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,632 $1,609 Implemented
UA0081 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $24,682 $6,975 Not Implemented
UA0081 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,459 $480 Implemented
UA0081 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,206 $5,100 Implemented
UA0081 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,481 $2,210 Implemented
UA0081 # 07 Y:2012 07 2012 ELIMINATE/REDUCE AN OPERATION $119 $85 Not Implemented
MS0390 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,662 $51,336 Not Implemented
MS0390 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,625 $24,932 Not Implemented
MS0390 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,384 $351 Not Implemented
DL0081 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $323,076 $500,000 Not Implemented
DL0081 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,870 $24,400 Implemented
DL0081 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,801 $36,000 Implemented
DL0081 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,818 $54,000 Implemented
DL0081 # 05 Y:2012 05 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $18,222 $42,000 Not Implemented
DL0081 # 06 Y:2012 06 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,850 $4,500 Not Implemented
DL0081 # 07 Y:2012 07 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,257 $28,000 Not Implemented
DL0081 # 08 Y:2012 08 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $16,536 $8,900 Not Implemented
DL0081 # 09 Y:2012 09 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,536 $25,000 Not Implemented
DL0081 # 10 Y:2012 10 2012 REDUCE VENTILATION AIR $26,354 $4,500 Implemented
DL0081 # 11 Y:2012 11 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,412 $720 Not Implemented
DL0072 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $282,000 $500,000 Not Implemented
DL0072 # 02 Y:2011 02 2011 OPERATE BOILERS ON HIGH FIRE SETTING $136,800 $100,000 Not Implemented
DL0072 # 03 Y:2011 03 2011 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,600 $5,000 Not Implemented
DL0072 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $44,400 $2,000 Not Implemented