Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 2015 | Poultry Slaughtering And Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0543 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,597 | $3,000 | Not Implemented |
LE0543 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,298 | $8,400 | Implemented |
LE0543 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $210 | $760 | Implemented |
LE0543 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,200 | $9,000 | Implemented |
LE0543 # 06 Y:2023 | 06 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,075 | $13,169 | Implemented |
LE0543 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $839 | $100 | Implemented |
SU0164 # 14 Y:2003 | 14 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $198 | $150 | Not Implemented |
SU0164 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $29 | Implemented |
SU0164 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $550 | $0 | Implemented |
SU0164 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $723 | $608 | Implemented |
SU0164 # 10 Y:2003 | 10 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $847 | $1,744 | Implemented |
SU0164 # 09 Y:2003 | 09 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,293 | $955 | Implemented |
SU0164 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,485 | $700 | Implemented |
SU0164 # 07 Y:2003 | 07 | 2003 | REDESIGN PROCESS | $6,861 | $270 | Implemented |
SU0164 # 06 Y:2003 | 06 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $7,910 | $10,000 | Not Implemented |
SU0164 # 05 Y:2003 | 05 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $8,721 | $0 | Implemented |
SU0164 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,096 | $55,580 | Implemented |
SU0164 # 03 Y:2003 | 03 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,000 | $76,518 | Not Implemented |
SU0164 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $115,419 | $348,540 | Implemented |
SU0164 # 01 Y:2003 | 01 | 2003 | INSTALL WIND POWERED ELECTRIC GENERATOR | $141,258 | $1,171,875 | Not Implemented |