Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
20
matching recommendationsSIC | 2015 | Poultry Slaughtering And Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0392 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,625 | $0 | Implemented |
GT0392 # 12 Y:1989 | 12 | 1989 | REDUCE OR ELIMINATE WASTE | $24,430 | $0 | Implemented |
GT0392 # 11 Y:1989 | 11 | 1989 | USE OPTIMUM THICKNESS INSULATION | $740 | $1,190 | Not Implemented |
GT0392 # 10 Y:1989 | 10 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,490 | $27,500 | Not Implemented |
GT0392 # 09 Y:1989 | 09 | 1989 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $41,430 | $16,000 | Implemented |
GT0392 # 08 Y:1989 | 08 | 1989 | USE OPTIMUM THICKNESS INSULATION | $14,830 | $22,000 | Not Implemented |
GT0392 # 07 Y:1989 | 07 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,120 | $1,220 | Implemented |
GT0392 # 06 Y:1989 | 06 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $3,490 | $375 | Implemented |
GT0392 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,680 | $2,110 | Implemented |
GT0392 # 04 Y:1989 | 04 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $650 | $0 | Not Implemented |
GT0390 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,040 | $0 | Implemented |
GT0392 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,803 | $2,217 | Implemented |
GT0392 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,550 | $0 | Implemented |
GT0390 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,700 | $0 | Implemented |
GT0390 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,230 | $29,500 | Implemented |
GT0390 # 06 Y:1989 | 06 | 1989 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $14,480 | $16,950 | Not Implemented |
GT0390 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $219 | $350 | Implemented |
GT0390 # 04 Y:1989 | 04 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $423 | $210 | Implemented |
GT0390 # 03 Y:1989 | 03 | 1989 | INSULATE BARE EQUIPMENT | $534 | $1,020 | Implemented |
GT0390 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $604 | $2,400 | Implemented |