IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0031 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,159 $2,803 Not Implemented
OD0031 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,349 $66,206 Not Implemented
OD0031 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,336 $48,924 Not Implemented
OD0031 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $5,440 $1,793 Not Implemented
OD0031 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $12,618 $26,618 Not Implemented
OD0031 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $1,000 Not Implemented
OD0031 # 08 Y:1995 08 1995 AVOID FROST FORMATION ON EVAPORATORS $29,378 $33,000 Not Implemented
OD0031 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,274 $45,837 Not Implemented
UF0106 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,054 $17,625 Implemented
UF0106 # 07 Y:1995 07 1995 OPERATE BOILERS ON HIGH FIRE SETTING $5,249 $0 Not Implemented
UF0106 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $925 $1,425 Implemented
UF0106 # 05 Y:1995 05 1995 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $189,560 $950,000 Not Implemented
UF0106 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,255 $5,200 Not Implemented
UF0106 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,861 $1,000 Implemented
UF0106 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,268 $2,638 Implemented
UM0016 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $536 $462 Implemented
UM0016 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,210 $15,700 Implemented
UM0016 # 03 Y:1995 03 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,760 $530 Implemented
UM0016 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,530 $460 Implemented