IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0074 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $893 $1,160 Implemented
MS0074 # 03 Y:1996 03 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,498 $9,420 Not Implemented
MS0074 # 04 Y:1996 04 1996 USE LESS WASTEFUL PACKAGING $228,700 $118,270 Not Implemented
MS0074 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $5,797 Not Implemented
UF0162 # 07 Y:1996 07 1996 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $1,074 $0 Not Implemented
UF0162 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,640 $3,500 Not Implemented
UF0162 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,167 $4,200 Not Implemented
UF0162 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,309 $9,372 Implemented
UF0162 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $982 $576 Not Implemented
UF0162 # 02 Y:1996 02 1996 DISCONNECT BALLASTS $1,934 $655 Implemented
UF0162 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $0 Not Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,300 $61,100 Not Implemented
TN0596 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $40,800 $99,260 Not Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 01 Y:1996 01 1996 REDESIGN PROCESS $97,310 $38,900 Not Implemented