Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,313
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0289 # 02 Y:2005 | 02 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,957 | $0 | Implemented |
BD0289 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,275 | $6,900 | Implemented |
BD0289 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $910 | $1,050 | Implemented |
BD0289 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $770 | $1,780 | Implemented |
BD0289 # 08 Y:2005 | 08 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $484 | $0 | Implemented |
BD0289 # 09 Y:2005 | 09 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $315 | $576 | Implemented |
BD0289 # 11 Y:2005 | 11 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $57,600 | $105,000 | Implemented |
SU0209 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,769 | $0 | Implemented |
SU0209 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,742 | $509 | Implemented |
SU0209 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,683 | $418 | Implemented |
SU0209 # 06 Y:2005 | 06 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $30,000 | $16,000 | Implemented |
SU0209 # 07 Y:2005 | 07 | 2005 | USE SYNTHETIC LUBRICANT | $1,072 | $1,000 | Implemented |
CO0559 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,070 | $440 | Implemented |
CO0559 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $355 | $416 | Implemented |
CO0559 # 03 Y:2004 | 03 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,190 | $740 | Implemented |
CO0559 # 04 Y:2004 | 04 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,180 | $810 | Implemented |
CO0559 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $710 | $1,790 | Implemented |
CO0559 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,760 | $2,260 | Implemented |
CO0559 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $572 | $292 | Implemented |
MI0101 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,178 | $180 | Implemented |
MI0101 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,200 | $6,660 | Implemented |
MI0101 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,386 | $1,030 | Implemented |
OR0479 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $116,320 | $115,000 | Implemented |
OR0479 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,750 | $100 | Implemented |
OR0479 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,710 | $800 | Implemented |