IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0042 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,033 $0 Not Implemented
MO0042 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,282 $1,788 Not Implemented
MO0042 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,276 $4,368 Not Implemented
MO0042 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,198 $0 Not Implemented
MO0042 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $974 $0 Not Implemented
MO0042 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,773 $2,146 Not Implemented
MO0042 # 02 Y:1991 02 1991 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,762 $705 Not Implemented
MO0042 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,257 $1,195 Not Implemented
KU0309 # 02 Y:1990 02 1990 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $10,130 $10,000 Not Implemented
KU0309 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,546 $12,840 Implemented
KU0309 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,042 $4,000 Implemented
KU0309 # 04 Y:1990 04 1990 TREAT AND REUSE RINSE WATERS $5,895 $4,000 Implemented
KU0309 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $386 $300 Implemented
KU0309 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $126 $180 Implemented
KU0309 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,428 $20,000 Not Implemented
KU0309 # 08 Y:1990 08 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,990 $2,400 Implemented
KU0165 # 10 Y:1985 10 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $400 Implemented
KU0165 # 02 Y:1985 02 1985 HEAT WATER WITH EXHAUST HEAT $20,949 $37,000 Implemented
KU0165 # 01 Y:1985 01 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $28,837 $33,000 Implemented
KU0165 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,822 $9,000 Not Implemented
KU0165 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,248 $4,815 Implemented
KU0165 # 05 Y:1985 05 1985 IMPROVE LUBRICATION PRACTICES $10,224 $8,000 Implemented
KU0165 # 06 Y:1985 06 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,321 $1,020 Implemented
KU0165 # 07 Y:1985 07 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $50 Implemented
KU0165 # 08 Y:1985 08 1985 RECOVER WASTE HEAT FROM EQUIPMENT $998 $450 Implemented