IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0112 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,310 $37,932 Implemented
AS0112 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,174 $9,280 Not Implemented
AS0112 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,508 $525 Not Implemented
AS0112 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $1,035 $400 Implemented
AS0112 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,694 $4,000 Implemented
AS0112 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,941 $16,000 Not Implemented
AS0112 # 08 Y:1994 08 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,341 $7,000 Implemented
AS0112 # 09 Y:1994 09 1994 REPAIR AND ELIMINATE STEAM LEAKS $305 $400 Implemented
AS0112 # 10 Y:1994 10 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,970 $700 Implemented
AS0112 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,886 $0 Not Implemented
AS0112 # 12 Y:1994 12 1994 USE SYNTHETIC LUBRICANT $4,287 $4,235 Not Implemented
AS0112 # 13 Y:1994 13 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,104 $16,099 Implemented
AS0112 # 14 Y:1994 14 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,107 $0 Implemented
AS0112 # 15 Y:1994 15 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $119,133 $463,200 Not Implemented
AS0057 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $41,691 $235,000 Not Implemented
AS0057 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,343 $0 Not Implemented
AS0057 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,703 $18,211 Not Implemented
AS0057 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,613 $0 Not Implemented
AS0057 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $300 Not Implemented
AS0057 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $2,000 $3,276 Not Implemented
AS0057 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $3,210 Not Implemented
AS0057 # 08 Y:1992 08 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $989 $200 Not Implemented
AS0057 # 09 Y:1992 09 1992 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,775 $6,535 Not Implemented
AS0025 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,398 $10,675 Not Implemented
AS0025 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,118 $2,200 Not Implemented