Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,779
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0244 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $38,250 | $1,066 | Not Implemented |
SU0244 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,614 | $0 | Not Implemented |
SU0244 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $93,478 | $10,000 | Not Implemented |
SU0244 # 06 Y:2006 | 06 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $16,219 | $432 | Implemented |
SU0244 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,070 | $1,038 | Implemented |
SU0244 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,016 | $5,266 | Not Implemented |
SU0244 # 09 Y:2006 | 09 | 2006 | INSULATE FEEDWATER TANK | $3,113 | $2,058 | Implemented |
SU0244 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,277 | $20,000 | Implemented |
SU0244 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $448 | $356 | Implemented |
SU0244 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PLANT POWER FACTOR | $11,590 | $30,856 | Not Implemented |
SU0244 # 13 Y:2006 | 13 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,187,734 | $4,100,000 | Not Implemented |
OR0507 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,600 | $0 | Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 03 Y:2006 | 03 | 2006 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $13,600 | $3,200 | Not Implemented |
OR0507 # 04 Y:2006 | 04 | 2006 | KEEP BOILER TUBES CLEAN | $13,700 | $4,000 | Implemented |
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,600 | $1,200 | Not Implemented |
OR0507 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,400 | $23,200 | Not Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |
OR0507 # 14 Y:2006 | 14 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,300 | $5 | Not Implemented |