IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,779

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0394 # 04 Y:2005 04 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $71,792 $33,000 Not Implemented
AS0394 # 05 Y:2005 05 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $443,040 $453,047 Implemented
UU0081 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,948 $2,000 Not Implemented
UU0081 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,684 $6,171 Not Implemented
UU0081 # 03 Y:2005 03 2005 INSTALL COMMON HEADER ON COMPRESSORS $1,717 $1,270 Not Implemented
UU0081 # 04 Y:2005 04 2005 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,724 $11,700 Not Implemented
UU0081 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,000 $500 Not Implemented
UU0081 # 06 Y:2005 06 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $996,810 $10,000,000 Not Implemented
UU0081 # 07 Y:2005 07 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $117 $0 Not Implemented
UU0080 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,095 $3,040 Not Implemented
UU0080 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $5,900 $0 Not Implemented
UU0080 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $681 $2,276 Not Implemented
UU0080 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,294 $70,000 Not Implemented
UU0080 # 05 Y:2005 05 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,535 $0 Not Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $3,000 Not Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
UM0272 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $5,009 Not Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented
LL0207 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $34,833 $7,488 Implemented
LL0207 # 03 Y:2004 03 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $6,837 $12,236 Not Implemented
LL0207 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,171 $225 Not Implemented
LL0207 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,149 $1,960 Implemented
LL0207 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $449 $30 Not Implemented
LL0207 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $525 Not Implemented