IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,773

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0112 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,694 $4,000 Implemented
AS0112 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,941 $16,000 Not Implemented
AS0112 # 08 Y:1994 08 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,341 $7,000 Implemented
AS0112 # 09 Y:1994 09 1994 REPAIR AND ELIMINATE STEAM LEAKS $305 $400 Implemented
AS0112 # 10 Y:1994 10 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,970 $700 Implemented
AS0112 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,886 $0 Not Implemented
AS0112 # 12 Y:1994 12 1994 USE SYNTHETIC LUBRICANT $4,287 $4,235 Not Implemented
AS0112 # 13 Y:1994 13 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,104 $16,099 Implemented
AS0112 # 14 Y:1994 14 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,107 $0 Implemented
AS0112 # 15 Y:1994 15 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $119,133 $463,200 Not Implemented
OR0188 # 01 Y:1993 01 1993 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,784 $15,000 Implemented
OR0188 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,389 $1,320 Implemented
OR0188 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $1,031 $750 Not Implemented
OR0188 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17 $84 Implemented
KU0407 # 01 Y:1993 01 1993 UPGRADE OBSOLETE EQUIPMENT $15,428 $3,583 Implemented
KU0407 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $3,653 $9,978 Not Implemented
KU0407 # 03 Y:1993 03 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $986 $2,400 Not Implemented
KU0407 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,730 $200 Implemented
KU0407 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $1,120 Implemented
KU0407 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $563 Implemented
KU0407 # 07 Y:1993 07 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,611 $0 Not Implemented
IA0061 # 01 Y:1993 01 1993 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $136,096 $379,828 Not Implemented
IA0061 # 02 Y:1993 02 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $68,521 $75,677 Not Implemented
IA0061 # 03 Y:1993 03 1993 REPLACE BOILER $15,800 $23,150 Not Implemented
IA0061 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,928 $1,939 Implemented