IAC logo
IAC Assessment: DS0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1994
Principal Product Butter
NAICS n/a
SIC 2021 - Creamery Butter
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 65,600
Annual Production 95,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,108 4,686,987 kWh $0.05
Natural Gas $4,665 928 MMBtu $5.03
Other Energy $252,012 38,911 MMBtu $6.48
TOTAL ENERGY COSTS $498,785
RECOMMENDED SAVINGS* $73,129 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,517
#|Description Savings
Cost
Status Electricity Usage Other Energy Electricity Usage Other Energy
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,039
Cost:
$14,247
$9,039 174,678 - - $9,039
174,678
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$227
Cost:
$900
$227 4,396 - - $227
4,396
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,273
Cost:
$4,694
$5,273 101,993 - - $5,273
101,993
kWh
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,195
Cost:
$285
- - $3,195 1,049 -
-
kWh
$3,195
1,049
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$596
Cost:
$400
- - $596 74 -
-
kWh
$596
74
MMBtu
06: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$12,354
Cost:
$4,170
- - $12,354 229 -
-
kWh
$12,354
229
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,139
Cost:
$17,245
$7,139 138,042 - - $7,139
138,042
kWh
-
-
MMBtu
08: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$7,726
Cost:
$26,660
$7,726 149,472 - - $7,726
149,472
kWh
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,257
Cost:
$1,504
$3,257 63,013 - - $3,257
63,013
kWh
-
-
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,612
Cost:
$1,248
$1,612 38,101 - - $1,612
38,101
kWh
-
-
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$201
Cost:
$153
$201 5,569 - - $201
5,569
kWh
-
-
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$150
Cost:
$138
$150 7,034 - - $150
7,034
kWh
-
-
MMBtu
13: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$22,360
Cost:
$4,000
- - $22,360 3,150 -
-
kWh
$22,360
3,150
MMBtu
TOTAL RECOMMENDED Savings:
$73,129
Cost:
$75,644
$34,624 682,298 $38,505 4,502 $34,624
682,298
kWh
$38,505
4,502
MMBtu
TOTAL IMPLEMENTED Savings:
$11,517
Cost:
$27,345
$7,726 149,472 $3,791 1,123 $7,726
149,472
kWh
$3,791
1,123
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Energy Electricity Usage Other Energy