Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0958 # 05 Y:2016 | 05 | 2016 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,954 | $1,227 | Not Implemented |
OK0958 # 13 Y:2016 | 13 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $309,693 | $1,927,657 | Not Implemented |
OK0958 # 12 Y:2016 | 12 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,996 | $0 | Implemented |
OK0958 # 10 Y:2016 | 10 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,151 | $70,000 | Implemented |
OK0958 # 11 Y:2016 | 11 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,955 | $100,000 | Implemented |
OK0958 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,623 | $520 | Not Implemented |
OK0958 # 08 Y:2016 | 08 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $2,283 | $4,147 | Not Implemented |
OK0958 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,455 | $0 | Implemented |
OK0958 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,755 | $0 | Not Implemented |
OK0958 # 03 Y:2016 | 03 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $7,914 | $3,250 | Implemented |
OK0958 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,461 | $2,000 | Implemented |
OK0958 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,160 | $17,885 | Not Implemented |
OK0958 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,735 | $9,149 | Implemented |
KU0524 # 01 Y:1999 | 01 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,520 | $18,350 | Implemented |
KU0524 # 07 Y:1999 | 07 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $600 | $0 | Implemented |
KU0524 # 06 Y:1999 | 06 | 1999 | USE SYNTHETIC LUBRICANT | $650 | $1,160 | Implemented |
KU0524 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $750 | $680 | Implemented |
KU0524 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,070 | $1,270 | Implemented |
KU0524 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,820 | $3,790 | Implemented |
KU0524 # 02 Y:1999 | 02 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,110 | $2,500 | Implemented |
KU0312 # 03 Y:1990 | 03 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,389 | $7,925 | Implemented |
KU0312 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $135 | $113 | Implemented |
KU0312 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,422 | $8,763 | Implemented |
KU0312 # 04 Y:1990 | 04 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,778 | $4,500 | Implemented |
KU0312 # 05 Y:1990 | 05 | 1990 | INSTALL AUTOMATIC STACK DAMPER | $1,354 | $1,700 | Not Implemented |