Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0580 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $111,555 | $686,000 | n/a |
LE0580 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,713 | $24,500 | n/a |
LE0580 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $58,861 | $112,160 | n/a |
LE0580 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,807 | $11,787 | n/a |
LE0580 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,743 | $17,793 | n/a |
LE0580 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $51,486 | $26,800 | n/a |
LE0580 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,713 | $2,350 | n/a |
DL0191 # 10 Y:2021 | 10 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,846 | $1,500 | Not Implemented |
DL0191 # 12 Y:2021 | 12 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,502 | $22,000 | Not Implemented |
DL0191 # 11 Y:2021 | 11 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,536 | $925 | Not Implemented |
DL0191 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,696 | $0 | Not Implemented |
DL0191 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,391 | $1,527 | Not Implemented |
DL0191 # 08 Y:2021 | 08 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $687 | $333 | Not Implemented |
DL0191 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,032 | $4,500 | Not Implemented |
DL0191 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,208 | $38 | Not Implemented |
DL0191 # 05 Y:2021 | 05 | 2021 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $5,413 | $1,000 | Not Implemented |
DL0191 # 04 Y:2021 | 04 | 2021 | INSTALL / REPAIR INSULATION ON STEAM LINES | $818 | $168 | Not Implemented |
DL0191 # 03 Y:2021 | 03 | 2021 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,622 | $600 | Not Implemented |
DL0191 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,827 | $0 | Not Implemented |