Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2205 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,984 | $15,999 | Implemented |
UW2205 # 02 Y:2022 | 02 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $169 | $838 | Not Implemented |
UW2205 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,244 | $12,938 | Implemented |
OR0587 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,854 | $2,854 | Implemented |
OR0587 # 03 Y:2012 | 03 | 2012 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,142 | $6,108 | Not Implemented |
OR0587 # 01 Y:2012 | 01 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $11,403 | $11,403 | Not Implemented |
OR0587 # 04 Y:2012 | 04 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,099 | $1,560 | Not Implemented |
OR0587 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,687 | $1,000 | Not Implemented |
OR0587 # 06 Y:2012 | 06 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,810 | $9,114 | Not Implemented |
OR0587 # 07 Y:2012 | 07 | 2012 | Install Anaerobic Digester | $75,601 | $294,329 | Not Implemented |
UW0035 # 02 Y:2010 | 02 | 2010 | IMPROVE COMBUSTION CONTROL CAPABILITY | $28,000 | $77,000 | Implemented |
UW0035 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $3,700 | $2,000 | Implemented |
UW0035 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,058 | $1 | Implemented |
UW0035 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,000 | $0 | Not Implemented |
UW0035 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,417 | $0 | Not Implemented |
OR0416 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $32,840 | $32,942 | Not Implemented |
OR0416 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,862 | $1,500 | Not Implemented |
OR0416 # 03 Y:2002 | 03 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $13,308 | $0 | Not Implemented |
OR0416 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,200 | $0 | Not Implemented |
OR0416 # 02 Y:2002 | 02 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $19,366 | $0 | Not Implemented |
OR0416 # 01 Y:2002 | 01 | 2002 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $140,000 | $790,000 | Not Implemented |
OR0416 # 07 Y:2002 | 07 | 2002 | OPTIMIZE PLANT POWER FACTOR | $15,524 | $38,000 | Not Implemented |
OR0281 # 08 Y:1996 | 08 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $120 | $0 | Implemented |
OR0281 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,450 | $34,810 | Implemented |
OR0281 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,000 | $128,480 | Implemented |