Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0165 # 01 Y:1992 | 01 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,045 | $500 | Implemented |
OR0165 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,788 | $0 | Implemented |
OR0165 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $0 | Not Implemented |
OR0165 # 04 Y:1992 | 04 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,074 | $2,250 | Implemented |
OR0165 # 05 Y:1992 | 05 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $830 | $0 | Implemented |
OR0165 # 06 Y:1992 | 06 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $320 | $824 | Implemented |
WI0160 # 01 Y:1992 | 01 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,410 | $3,576 | Not Implemented |
GT0477 # 04 Y:1992 | 04 | 1992 | HEAT WATER WITH EXHAUST HEAT | $690 | $1,490 | Not Implemented |
GT0477 # 03 Y:1992 | 03 | 1992 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140 | $100 | Not Implemented |
GT0477 # 02 Y:1992 | 02 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,233 | $27,230 | Not Implemented |
GT0477 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,693 | $8,240 | Not Implemented |
GT0477 # 05 Y:1992 | 05 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,470 | $450 | Not Implemented |
WI0160 # 07 Y:1992 | 07 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $268 | $600 | Not Implemented |
WI0160 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,046 | $500 | Implemented |
WI0160 # 08 Y:1992 | 08 | 1992 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $127 | $0 | Not Implemented |
WI0160 # 05 Y:1992 | 05 | 1992 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $463 | $1,400 | Not Implemented |
GT0477 # 06 Y:1992 | 06 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,120 | $550 | Not Implemented |
GT0477 # 07 Y:1992 | 07 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $330 | $690 | Not Implemented |
GT0477 # 08 Y:1992 | 08 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,200 | $6,500 | Not Implemented |
WI0160 # 04 Y:1992 | 04 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $994 | $1,200 | Not Implemented |
WI0160 # 03 Y:1992 | 03 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,080 | $960 | Not Implemented |
WI0160 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $541 | $0 | Not Implemented |
OR0156 # 07 Y:1992 | 07 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $102 | $164 | Implemented |
OR0156 # 06 Y:1992 | 06 | 1992 | RECOVER AND REUSE COOLING WATER | $3,527 | $5,105 | Implemented |
OR0156 # 05 Y:1992 | 05 | 1992 | INSTALL SET-BACK TIMERS | $387 | $360 | Not Implemented |