Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0244 # 13 Y:2006 | 13 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,187,734 | $4,100,000 | Not Implemented |
SU0244 # 09 Y:2006 | 09 | 2006 | INSULATE FEEDWATER TANK | $3,113 | $2,058 | Implemented |
SU0244 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PLANT POWER FACTOR | $11,590 | $30,856 | Not Implemented |
SU0244 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,016 | $5,266 | Not Implemented |
SU0244 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $448 | $356 | Implemented |
SU0244 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,070 | $1,038 | Implemented |
SU0244 # 06 Y:2006 | 06 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $16,219 | $432 | Implemented |
SU0244 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $93,478 | $10,000 | Not Implemented |
SU0244 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,614 | $0 | Not Implemented |
SU0244 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $38,250 | $1,066 | Not Implemented |
SU0244 # 02 Y:2006 | 02 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $8,145 | $0 | Implemented |
SU0244 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33,798 | $0 | Implemented |
SU0244 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,277 | $20,000 | Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,400 | $330,000 | Not Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,600 | $1,200 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 14 Y:2006 | 14 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,300 | $5 | Not Implemented |
OR0507 # 03 Y:2006 | 03 | 2006 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $13,600 | $3,200 | Not Implemented |