Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0643 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,900 | $500 | Implemented |
AM0643 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,940 | $235 | Implemented |
AM0643 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,700 | $1,800 | Not Implemented |
AM0643 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,370 | $50 | Implemented |
AM0643 # 01 Y:2013 | 01 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $34,060 | $250,000 | Implemented |
AM0643 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $307 | $157 | Not Implemented |
AM0643 # 07 Y:2013 | 07 | 2013 | USE SYNTHETIC LUBRICANT | $1,887 | $0 | Not Implemented |
AM0643 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $500 | Implemented |
AM0643 # 09 Y:2013 | 09 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $250 | $126 | Not Implemented |
MZ0112 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $6,417 | $3,000 | Implemented |
MZ0112 # 09 Y:2013 | 09 | 2013 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $61,800 | $450,000 | Not Implemented |
MZ0112 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,303 | $1,160 | Not Implemented |
MZ0112 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,737 | $0 | Not Implemented |
MZ0112 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,024 | $1,150 | Not Implemented |
MZ0112 # 05 Y:2013 | 05 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $48,000 | $2,270 | Implemented |
MZ0112 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,415 | $0 | Implemented |
MZ0112 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,329 | $0 | Not Implemented |
MZ0112 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,576 | $14,260 | Implemented |
BS0009 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,037 | $126 | Implemented |
BS0009 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,495 | $1,840 | Not Implemented |
BS0009 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,077 | $689 | Implemented |
BS0009 # 06 Y:2013 | 06 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,422 | $3,959 | Implemented |
BS0009 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,591 | $260 | Implemented |
BS0009 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,533 | $2,806 | Not Implemented |
BS0009 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,187 | $1,066 | Not Implemented |