Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsSIC | 2021 | Creamery Butter |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0289 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,189 | $3,500 | Implemented |
BD0289 # 02 Y:2005 | 02 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,957 | $0 | Implemented |
BD0289 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,275 | $6,900 | Implemented |
BD0289 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,225 | $1,500 | Not Implemented |
BD0289 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $910 | $1,050 | Implemented |
BD0289 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $694 | $900 | Not Implemented |
BD0289 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $770 | $1,780 | Implemented |
BD0289 # 08 Y:2005 | 08 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $484 | $0 | Implemented |
BD0289 # 09 Y:2005 | 09 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $315 | $576 | Implemented |
BD0289 # 10 Y:2005 | 10 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,052 | $0 | Not Implemented |
BD0289 # 11 Y:2005 | 11 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $57,600 | $105,000 | Implemented |
OR0479 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $116,320 | $115,000 | Implemented |
OR0479 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,750 | $100 | Implemented |
OR0479 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,710 | $800 | Implemented |
OR0479 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,500 | $0 | Not Implemented |
OR0479 # 05 Y:2005 | 05 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $700 | $0 | Not Implemented |