IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1405 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $20,457 $15,610 Implemented
UK1405 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $46,464 Implemented
UK1405 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $15,146 $1,540 Implemented
UK1405 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,374 $24,100 Implemented
UK1405 # 14 Y:2014 14 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $30 Implemented
UK1405 # 12 Y:2014 12 2014 INSULATE FEEDWATER TANK $3,480 $1,769 Implemented
BS0037 # 07 Y:2014 07 2014 ISOLATE HOT OR COLD EQUIPMENT $26 $21 Implemented
BS0037 # 06 Y:2014 06 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $674 $575 Implemented
BS0037 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $1,042 Implemented
BS0037 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $517 $2,038 Implemented
BS0037 # 01 Y:2014 01 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $108 $540 Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0407 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,965 $672 Implemented
SF0407 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,152 $672 Implemented
SF0407 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,437 $1,299 Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented
SF0404 # 10 Y:2011 10 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $676 $1,569 Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
BD0393 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $10 Implemented
BD0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,288 $107,000 Implemented
BD0393 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $155 $300 Implemented
SD0434 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $100 Implemented