IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0601 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $35,057 $0 Implemented
SF0601 # 07 Y:2023 07 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,826 $62,630 Not Implemented
SF0601 # 04 Y:2023 04 2023 USE OPTIMUM THICKNESS INSULATION $3,765 $1,482 Implemented
SF0601 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $1,168 $200 Not Implemented
SF0601 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $80 Not Implemented
SF0601 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,103 $2,861 Not Implemented
SF0601 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,700 $12,525 Implemented
SF0519 # 09 Y:2018 09 2018 RECYCLE WHITE WATER $16,021 $7,759 Not Implemented
SF0519 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $376 $120 Not Implemented
SF0519 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $160 Not Implemented
SF0519 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $9,168 $23,469 Implemented
SF0519 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,309 $55,280 Not Implemented
SF0519 # 03 Y:2018 03 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,348 $20,000 Not Implemented
SF0519 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,990 $19,331 Not Implemented
SF0519 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $34,820 Not Implemented
SF0519 # 04 Y:2018 04 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,597 $2,408 Not Implemented
SF0487 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,944 $11,650 Not Implemented
SF0487 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,356 $0 Implemented
SF0487 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,738 $17,574 Implemented
SF0487 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $2,132 $534 Not Implemented
SF0487 # 06 Y:2016 06 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,794 $3,610 Not Implemented
SF0487 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $7,137 $27,407 Not Implemented
SF0487 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,545 $0 Not Implemented
SF0464 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $884 $0 Implemented
SF0464 # 03 Y:2015 03 2015 ADD AREA LIGHTING SWITCHES $6,212 $2,837 Implemented