IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0398 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,272 $1,333 Not Implemented
IA0398 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,710 $1,000 Implemented
IA0398 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,539 $900 Not Implemented
IA0398 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $9,808 $6,000 Implemented
IA0398 # 07 Y:2006 07 2006 REPAIR AND ELIMINATE STEAM LEAKS $7,646 $1,000 Implemented
IA0398 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $861 $555 Implemented
IA0398 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $255 $340 Implemented
IA0398 # 10 Y:2006 10 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $16,927 $4,400 Not Implemented
IA0398 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $742 $580 Implemented
OR0501 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $119,000 $200 Implemented
OR0501 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $72,600 $1 Implemented
OR0501 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $41,300 $59,700 Implemented
OR0501 # 04 Y:2006 04 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $31,700 $105 Implemented
OR0501 # 05 Y:2006 05 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $25,000 $3,400 Not Implemented
OR0501 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $8,560 $100 Implemented
OR0501 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,100 $0 Implemented
LM0116 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,946 $0 Not Implemented
LM0116 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $111,472 $82,700 Implemented
LM0116 # 03 Y:2006 03 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,913 $7,000 Not Implemented
LM0116 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230,613 $69,350 Implemented
LM0116 # 05 Y:2006 05 2006 ADD ADDITIONAL PRODUCTION SHIFT $337,500 $5,000 Not Implemented
LM0116 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $260 $0 Implemented
IA0377 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,676 $172 Implemented
IA0377 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,951 $80 Implemented
IA0377 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,838 $4,329 Implemented