IAC logo
IAC Assessment: LM0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product mozzarella
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 415
Plant Area (Sq.Ft.) 457,000
Annual Production 360,000,000 Pounds
Production Hrs. Annual 8,376
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,407,024 104,597,535 kWh $0.02
Electricity Demand $2,407,023 243,429 kW-months/year $9.89
Electricity Fees $749 - $ -
TOTAL ENERGY COSTS $4,814,796
RECOMMENDED SAVINGS* $695,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $342,345
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,946
Cost:
-
$7,289 - $5,657 - - - $7,289
-
kWh
$5,657
-
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$111,472
Cost:
$82,700
$91,870 1,039,800 $19,602 1,986 - - $91,870
1,039,800
kWh
$19,602
1,986
kW-months/year
-
-
$
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,913
Cost:
$7,000
$1,687 - $1,226 - - - $1,687
-
kWh
$1,226
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$230,613
Cost:
$69,350
$192,501 2,206,318 $38,112 2,702 - - $192,501
2,206,318
kWh
$38,112
2,702
kW-months/year
-
-
$
05: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$337,500
Cost:
$5,000
- - - - $337,500 - -
-
kWh
-
-
kW-months/year
$337,500
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$260
Cost:
-
$260 2,945 - - - - $260
2,945
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$695,704
Cost:
$164,050
$293,607 3,249,063 $64,597 4,688 $337,500 - $293,607
3,249,063
kWh
$64,597
4,688
kW-months/year
$337,500
-
$
TOTAL IMPLEMENTED Savings:
$342,345
Cost:
$152,050
$284,631 3,249,063 $57,714 4,688 - - $284,631
3,249,063
kWh
$57,714
4,688
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes